World Ski Champ Case Study
Electric Generators for World Ski Championships
The challenge this event posed began nine months prior to the
event itself when Aggreko’s technicians and engineers began the
planning and coordination that would lead to a seamless operation.
With the extreme cold temperatures, electric
generator equipment required special fuel and daily
checking to ensure continuous operation.
Electric Generator Hire for Sporting Events
A total of 290 tons of equipment was sent to St. Moritz,
including 44,000 kg (97,003 lbs) of cable that was carried and
installed by the Aggreko team after clearing 91 cm (3 ft) of snow
and 20.32 cm (8 in) of ice. The Aggreko crew worked 12 straight
days to lay the cable at an altitude of 2,438 m (8,000 ft) with
temperatures reaching below -20°c (-4°F), an extraordinary feat
with only seven hours of light each day. Aggreko's electric
generators powered all broadcasting, the IBC, the
International Press Center, the Medals Plaza, the food court, VIP
and volunteer tents, the team service centre and the Opening
Ceremonies.
Benefits to the Customer
Operating at temperatures often reaching below -23°C (-9°F), the
Aggreko team and equipment allowed the rest of the world to
continuously view and enjoy one of the greatest sporting events in
history.