India
Aggreko was chosen as the sole supplier of temporary electrical power generation and distribution for the 10 venues in Japan.
Aggreko provided uninterrupted, seamless power for the Beijing Olympics Games 2008.
With the extreme cold temperatures, equipment required special fuel and daily checking to ensure continuous operation.
6 MW temporary power provided for manufacturing plant in India after a fire.
Tunnelling conditions in this time sensitive motorway project were causing difficulty.
An enormous electrically powered open cast excavator needed to move 25 miles from one mine to another.
Technical problems with on-board generators in this Gulf of Mexico based rig meant emergency shut-down.
A container ship en route between Singapore and Los Angeles required an additional back-up generator with its own fuel supply.
Following the fifth consecutive year of minimal rainfall, reservoirs feeding Sri Lanka's hydro power plants were approaching critically low levels.
Aggreko provided a temperature control solution for an Alabama Grocery Distributor.